End-to-end data centre infrastructure — designed, supplied, installed and commissioned by HS Global.


HS Global manages the complete infrastructure scope for hyper-scale data centre deployments — one partner from design consultation through to commissioning, working to the exacting standards Tier-3 and Tier-4 facilities demand.
From first conversation to final handover — a single, accountable partner at every stage.
We start with a detailed consultation to understand your project requirements, site conditions, and operational standards. We clarify scope, timeline, and budget expectations upfront — no surprises downstream.
Our team produces a full design package covering power distribution, containment layout, rack placement, cabling routes, and cooling strategy — all engineered to Tier-3/4 requirements.
We source and supply all required equipment — server racks, busbars, battery cabinets, UPS and cooling units. Quality-checked before delivery, with lead times confirmed at design sign-off.
Our installation teams work to a detailed site programme, co-ordinating with your project manager and other trades. Every phase is supervised and documented in real time.
We carry out full functional testing and commissioning before handover. You receive a complete as-built package and post-commissioning support to ensure your infrastructure operates as specified.




Tell us about your project and we'll get back to you within one business day. No obligation — just a straight conversation about what you need.
Phone
+65 6931 1744Generator sets, OEM switchgear, precision cooling or renewable energy — tell us your scope and we'll get back to you promptly.